First Steel Goes Up at Construction Site

March 14, 2017
 

First steel going into place at NorthBay Medical Center

The first piece of steel was put in place today on the NorthBay Medical Center construction site. Each day for the rest of the week, through Friday, March 17, steel will be unloaded from three delivery trucks between 7:30 to 11:30 a.m.

Drivers and pedestrians should be extra cautious during this process. The single-lane exiting aisle along the construction site will be narrow while trucks are unloading. Please be alert for safety monitors who will intermittently stop vehicles and pedestrians to ensure safety during crane movement.

 

Tags: hardhat, northbay

Comments

 
 

Post A Comment